| Docs Help
  AppSource  
Docs  /  Solution  /  Construction Base  /  Business Central Extensions

 Manufacturing


2026/09/10 • 3 min. to read
Construction Base links Business Central production orders to construction jobs and Bills of Quantities, and extends the MEGABAU 365 machinery usage line with a site pick category. Two new factbox pages surface the linked production orders on jobs and on Bills of Quantities.

Manufacturing Setup (Business Central standard)

The standard Business Central Manufacturing Setup is extended with defaults for creating production orders from job planning, shown in a new Integration Construction group on the Manufacturing Setup page.
FieldDescription
Use planning templateUses a planning worksheet template to create production orders instead of a fixed status.
Planning WorksheetDefault planning worksheet name (a requisition worksheet of template type Planning), used when the planning template is active.
Production Order StatusDefault status for production orders created directly. Only relevant, and only shown, when "Use planning template" is not set.

Production Order (Business Central standard)

The standard Business Central Production Order table is extended with fields that record the construction source of the production order:

Fields

FieldDescription
Job No.Job the production order was created for.
Job Task No.Job task (within the job above) the production order was created for.
Sales Boq Order No.Bill of Quantities sales order the demand originates from.
Demand Requisition No.Demand requisition the production order was created from.
These read-only fields are shown on the Planned, Firm Planned, Released and Finished Production Order cards and on the Production Order List.

Prod. Order Components / Production BOM Lines (Business Central standard)

Both the standard Prod. Order Components and Production BOM Lines pages get a Basket action that adds the current component or BOM line to the Construction Base basket.

Job Usage Line Machinery (MEGABAU 365)

The MEGABAU 365 table Job Usage Line MachineryMGB, which records machinery usage on job expense/site pick documents, is extended with:
FieldDescription
Site Pick CategorySite pick category taken over from the related Job Expense Header.

Note

In the background, Construction Base also automatically adds and removes mandatory and optional machinery accessories when a machinery is selected via the Machinery Search on such a line, and ensures a site pick list stays in status "Open" while its lines are being inserted or modified.

New Factbox Pages

Two new Construction Base pages provide a production order overview as a factbox. Neither extends an existing object.
PageSource tableUsed on
Prod Orders Factbox (Job)JobJob Card and Job List, see Job Extensions.
Prod Orders Factbox (BoQ)Sales BoQ HeaderMGB (MEGABAU 365)Bill of Quantities sales documents.
Both factboxes show the number of planned, firm planned, released and finished production orders linked to the job or Bill of Quantities order, and the number of item ledger entries posted for it, each with drill-down to the corresponding list.

Related information




Submit feedback for
DE|EN Imprint